Texas A&M University-Kingsville

Reports

The PI/PD is responsible for compliance for technical or program reporting. Many federal agencies refuse to review proposal submissions if the PI/PD is delinquent in submitting reports on currently funded projects. The PI/PD should read the sponsor’s guidelines carefully to determine what reports are required, their frequency, and preparation instructions. Any report that needs a signature must be routed through ORSP for the Director's signature before being mailed out. Financial reports will be prepared by Post Award. A copy will be provided to the PI/PD. A copy of the required reports should be routed through ORSP before submission so that the Program Developer can aid in the narrative. Also ORSP needs a copy of all the reports  in order to comply with audit requirements.                 

This page was last updated on: January 27, 2012